Contact

Got questions?

BÜTECGesellschaft für bühnentechnische Einrichtungen mbHIndustriestrasse 41D-40822 Mettmann
Go to contact form

Stage technology

Stage & lighting hoists Fit lights and curtains on the floor, then raise them

Stage & Lighting Hoists

With a hoist system, the load comes down to your team – not the other way round. Trusses, curtains and spotlights come down for setting up and then go back up, by hand or by motor. BÜTEC supplies flybars with battens as well as simple chain or rope hoists, depending on what your room and your programme need.

  • Drivemanual or motorised
  • Typebattens, chain or rope hoists
  • Fortrusses, curtains, spotlights

Benefits

Less ladder work, more overview What a hoist system changes in the hall

  • Work on the floor

    Focus spotlights, hang curtains, plug in cables: all at working height. Only then does the load go up.

  • By hand or by motor

    A manual rope winch for the occasional change, a motorised chain hoist for the truss rig that moves every week.

  • Parked out of sight

    A truss rig can move to a hidden parking position, with a cable basket that catches the cables.

  • Fits the rest

    Trusses, curtain tracks, stage cabinet and platforms come from the same factory and are planned together.

Versions

Depending on load and use Four ways to raise something

  • Flybars with battens

    For curtains and spotlights above the stage that are changed regularly.

  • Chain hoists

    Motorised chain hoists move complete trusses with lights and curtain.

  • Rope hoists and manual winches

    A simple manual solution for light loads and occasional changes.

  • Hoist in the cabinet

    In the stage cabinet, a winch raises curtains and accessories after assembly, by crank or motor.

Hoist system with trusses, spotlights and red curtains above a stage

Planning

Planned early How your hoist system comes together

  1. Clarify the requirements

    What should move, how often and where to? Trusses, curtains, spotlights, projection screen.

  2. Plan parking positions

    In a new building or a refurbishment, we plan niches and recesses for chain hoists and curtain tracks, and maintenance shafts.

  3. Make and install

    Planning, production and installation from one source, in line with the safety rules and regulations that apply to your venue.

Accessories

Works with Accessories and systems for Hoist systems

Everything that goes with this product, sorted by task. Add parts straight to your enquiry.

  • Trusses

    Profiles: 2-, 3- and 4-point

References

In use Hoists above stages, grandstands and auditoriums

Manual cable winches
Hoist system with lighting technology
Hoist system system
Hoist system with lighting technology
Hoist system

Downloads Documents for Hoist systems

For planners

Tender text / CADOn request – we send you tender texts and CAD data for your project.Request

Questions

Questions about hoist systems

Which regulations is the system built to?

We plan every system in line with the safety rules and regulations that apply to your room. Tell us how the room is used, and we clarify the requirements with you.

Manual or motorised?

That depends on the load, the travel and how often it moves. For occasional changes a manual rope winch is often enough; a truss rig with many lights is usually motorised.

What does BÜTEC need for a quote?

Your concrete requirements: what should move, room dimensions and ceiling height, possible suspension points and how often you change over. Photos or a floor plan help.

We are building new. When should we ask?

In the planning phase. Then niches for parking positions, recesses and maintenance shafts can be planned in from the start instead of added later.

What should move in your hall? We plan the right hoists

Describe the loads, the travel and the room. You receive a proposal and a quote.